Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 02, 2009     Fuel lines - (.5 hour)       Category: Fuel System
Part 2 of 2:

Since I'm installing a piece of avionics (a Grand Rapids EIS) very close to where the left fuel line comes into the fuselage, I wanted to clarify the clearance issues there. I inserted a short piece of fuel line through the fuselage and slid the EIS into place. It'll be close, but as long as the fuel line bends forward immediately after passing through the fuselage skin, I think it will be fine.

I drilled out the fuel line holes on both sides to just under 7/8", and installed a rubber grommet in each. I'm glad I won't have to modify the fuel line entry point.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.